Sections 7 and 8 of M-11 Highway

Technical specifications

The length of construction section is 137.6 km.
The width of carriageway is 6 lanes (km 646 – km 684), 4 lanes (km 543 – km 646).
Bridges and overpasses of the main alignment – 48
Tunnel under railway tracks – 1

Тraffic density

Expected traffic density at the Sections is:

  • up to 26000 vehicles per day between km 543 – km 646;
  • up to 21000 vehicles per day between km 646 – km 684.

Location

Within the limits of Saint Petersburg, the Highway will pass through the territories of Moskovsky and Pushkinsky districts. In Leningrad region  - through Tosnensky district. On the territory of Novgorod region – through Novgorodsky and Chudovsky regions.

Тraffic interchanges

Three traffic interchanges are designed on intersections with main public motor roads:

  • One in Moskovsky district of Saint Petersburg in proximity to Pulkovskaya interchange. The interchange will ensure traffic connection with all districts of the city via the Ring Road and the Western High-Speed Diameter.
  • A traffic interchange on intersection of the Moscow – St. Petersburg Highway (km 649) with A-120 Magistralnaya motor road.
  • A traffic interchange on intersection with M-10 Rossiya motorway (km 545)